An integrated method for ranking of risk in BOT projects
Publish Year: 1392
Type: Conference paper
Language: English
View: 595
This Paper With 11 Page And PDF Format Ready To Download
- Certificate
- I'm the author of the paper
Export:
Document National Code:
ICPEEE01_2112
Index date: 6 September 2016
An integrated method for ranking of risk in BOT projects abstract
In BOT approach, the private sector is granted a concession to plan, design, construct, operate and maintain a project in a certain period of time and after that it should be transferred to the government. In this paper, at first the risks of the BOT projects are identified, then we rank the risks based on their severity and effect on project objectives (time, cost, quality, safety and environmental) by two methods, namely FTOPSIS and FSAW. In the next stage obtained results by NGT method are integrated. After wise the occurrence and detection values of each risk are determined by experts and ultimately the risks are evaluated according to risk priority number (RPN) of failure mode and effect analysis (FMEA) technique. Finally, an example is shown to highlight the procedure of the proposed method at the end of this paper.
An integrated method for ranking of risk in BOT projects Keywords:
An integrated method for ranking of risk in BOT projects authors
Mohsen Askari
Department of Industrial Engineering, Payame Noor University
Hamid Reza Shokrizadeh
Department of Management, Payame Noor University
Maryam Sedaghat
Department of Management, Allameh Tabataba'i University, Tehran ,Iran