سیویلیکا را در شبکه های اجتماعی دنبال نمایید.

An integrated method for ranking of risk in BOT projects

Publish Year: 1392
Type: Conference paper
Language: English
View: 595

This Paper With 11 Page And PDF Format Ready To Download

Export:

Link to this Paper:

Document National Code:

ICPEEE01_2112

Index date: 6 September 2016

An integrated method for ranking of risk in BOT projects abstract

In BOT approach, the private sector is granted a concession to plan, design, construct, operate and maintain a project in a certain period of time and after that it should be transferred to the government. In this paper, at first the risks of the BOT projects are identified, then we rank the risks based on their severity and effect on project objectives (time, cost, quality, safety and environmental) by two methods, namely FTOPSIS and FSAW. In the next stage obtained results by NGT method are integrated. After wise the occurrence and detection values of each risk are determined by experts and ultimately the risks are evaluated according to risk priority number (RPN) of failure mode and effect analysis (FMEA) technique. Finally, an example is shown to highlight the procedure of the proposed method at the end of this paper.

An integrated method for ranking of risk in BOT projects Keywords:

An integrated method for ranking of risk in BOT projects authors

Mohsen Askari

Department of Industrial Engineering, Payame Noor University

Hamid Reza Shokrizadeh

Department of Management, Payame Noor University

Maryam Sedaghat

Department of Management, Allameh Tabataba'i University, Tehran ,Iran