Energy Delivery at Oil and Gas Wells Construction in Regions with Harsh Climate

Publish Year: 1394
نوع سند: مقاله ژورنالی
زبان: English
View: 387

This Paper With 6 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_IJE-29-2_017

تاریخ نمایه سازی: 12 دی 1395

Abstract:

Energy delivery at well construction in regions with hard climate is distinguished by variable demand in electric and heat power. Energy consumption of drilling equipment, production and living facilities varies greatly during the year, depending on power load charts and climate conditions. Power supply of remote well construction sites is mostly accomplished by operating autonomous power sources, such as gas turbine units. In this regard efficiency enhancement of power units is seen as relevant task. Thus combined heat and power structure for efficient power supply of well construction operations is offered by the authors. Required amount of electric and heat energy at well drilling in harsh climate is calculated in the paper. Also scheme of energy delivering structure based on gas turbine units with flue gases heat utilization for rig objects heating is developed in the article.

Keywords:

Combined Heat and PowerDrilling Operations ProvisionEnergy DeliveryGas Turbine

Authors

V Morenov

National Mineral Resources University (Mining Universit), Electromechanical Department, Saint Petersburg, Russia

E Leusheva

National Mineral Resources University (Mining University), Oil and Gas Department, Saint Petersburg, Russia