Verify the reliability of production planning systems and identifydeviations between program

Publish Year: 1395
نوع سند: مقاله کنفرانسی
زبان: English
View: 537

This Paper With 12 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

ICMHCONF02_132

تاریخ نمایه سازی: 5 بهمن 1395

Abstract:

The high dynamics of markets are only one reason for the increasing complexity ofproduction planning and control. To handle this complexity manufacturing companies haveimplemented IT systems to support decision-making in detailed scheduling processes.However, applied IT systems often do not provide a reliable forecast of delivery dates,because the planning models are implemented uniquely and have never been adapted due tochanges in the production system. This paper presents an approach to verify the forecastreliability of detailed planning systems by identifying deviations between the predictedproduction schedule, determined by the IT system, and the observed production processes inreality. The paper introduces the reasons for deviations and explains how they can bedetermined. The approach represents how categorical and continuous verification methodscan be applied to identify the described deviations. Depending on the determined deviationsthe forecast quality index of detailed planning systems is developed. Besides the assessmentof the forecast quality the reasons for deviations are of interest to production planners.Identified reasons are the starting point for adaptions in planning models to enable a reliableforecast of re-configurable production planning systems in the future

Authors

Ebrahim Sepehri Shafig

Department of Management , Islamic Azad University of Tabriz

Kamalledin Rahmani

Assistant Professor, Department of Management , Islamic Azad University of Tabriz

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • Zah MF, Reinhart G, Ostgathe M, Geiger F, Lau C. ...
  • Pfeiffer A, Kadar B, Szathmari M, Popovics G, Ven Z, ...
  • ElMaraghy H, AlGeddawy T, Azab A, ElMaraghy W. Change in ...
  • Wiendahl H, ElMaraghy HA, Nyhuis P, Zah MF, Wiendahl H, ...
  • ElMaraghy HA. Changeable and reconfigurable manufacturing systems. London: Springer; 2009. ...
  • Schuh G, Potente T, Thomas C, Hauptvogel A. Cyber-Physical Production ...
  • Schuh G, Stich V (eds.). Produktion am Standort Deutschland (Production ...
  • Laboratory for Machine Tools and Production Engineering (WZL) of RWTH ...
  • Gausemeier J, Frank U, Donoth J, Kahl S. Specification technique ...
  • Warnecke H, Hiiser M. The fractal company: A revolution in ...
  • Valckenaers P, Bonneville F, van Brussel H, Bongaerts L, Wyns ...
  • Okino N. Bionic Manufacturing Systems: Modelon-B ased Approach. In: Proceedings ...
  • Ueda K. A concept for bionic manufacturing systems based on ...
  • Van Brussel H, Wyns J, Valckenaers P, Bongaerts L, Peeters ...
  • Fowler JW, Rose O. Grand Challenges in Modeling and Simulation ...
  • Selke C. Entwicklung von Methoden _ automatischen S imulationsmo dellgenerierung ...
  • Reinhart G, Gyger T. Identification of implicit strategies in production ...
  • Horn S, Weigert G, Werner S. Data coupling strategies in ...
  • Pfeiffer A. Novel Methods for Decision Support in Production Planning ...
  • Kdar B, Pfeiffer A, Monostori L, Popovics G, Ven Z. ...
  • Kapp R, Le Blond J, Liffler B, Westkamper E. Integrated ...
  • Agile, Reconfigurable and Virtual Production (CARV 2005). Minchen: Herbert Utz ...
  • Kapp R. Ein b etrieb sbegleitendes F abriks imulations system ...
  • Baheti R, Gill H. Cyber-physical Systems. In: Samad T, Annaswamy ...
  • Rajkumar R, Lee I, Sha L, Stankovic J. Cyber-physical systems: ...
  • Lee EA. Cyber Physical Systems: Design Challenges. In: 11th IEEE ...
  • Li R, Shyu Y, Adiga S. A heuristic rescheduling algorithm ...
  • Kletti J, Schumacher . Die perfekte Produktion (Perfect manufacturing) _ ...
  • Jollife IT, Stephenson DB. Forecast verification: A practioner's guide in ...
  • نمایش کامل مراجع