Material requirements planning with a fuzzy model

Publish Year: 1396
نوع سند: مقاله کنفرانسی
زبان: English
View: 355

This Paper With 12 Page And PDF and WORD Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

INDUSTRIAL03_0939

تاریخ نمایه سازی: 26 مرداد 1397

Abstract:

There are numerous uncertainty forms and modes capable of affecting theMaterial requirements planning(MRP) systems. The aim of this study was to provide a fuzzy multi-objective decision-making model for MRP problem. In this paper, a fuzzy multi-objective linear programming approach was proposed for MRP model with a fuzzy Lead Time (LT), in which, the MRP models of classic numbers were combined up to the probability of occurrence of each of the possible LTs as far as possible. Then, an objective function was considered, which maximizes the probability of occurrence of LTs. The initial values of the MRP model were applied to this objective function and some decision makers were shown that with their risky behavior accept some LTs, which improve other goals, but their probability of occurrence is poor.

Authors

Farid Asgari

Department of industrial engineering, Science and Research Branch, Islamic Azad University, Tehran, Iran

Mohsen Sargazi

Department of industrial engineering, Science and Research Branch, Islamic Azad University, Tehran, Iran

Seyed Mohammad Haji Molana

Department of industrial engineering, Science and Research Branch, Islamic Azad University, Tehran, Iran