Tendencies in Multi-Span Large Deck Construction with Cast in Situ Process
Publish place: 4rd Iran International Conference on Structural Engineering
Publish Year: 1396
Type: Conference paper
Language: English
View: 379
This Paper With 9 Page And PDF Format Ready To Download
- Certificate
- I'm the author of the paper
Export:
Document National Code:
ISSEE04_089
Index date: 29 June 2019
Tendencies in Multi-Span Large Deck Construction with Cast in Situ Process abstract
In the past decades, a critical range of spans – 70m to 100m - for multi-span viaducts with concrete decks has been identified. The most common construction methods adopted for that type of viaduct are 1) cast in situ free cantilever; 2) precast segmental free cantilever and 3) precast full segment. The first is a low productivity method, with medium material consumption and with low equipment investment. The second is a medium productivity method, with high material consumption and with medium equipment investment. The third is a high productivity method, with medium-high material consumption and with very high investment in equipment and site facilities. With recent technological developments, another possible 4th alternative may be considered and studied for certain bridge types within the span range of 70m to 100m: in situ, span by span construction. In this presentation its features and its limitations are discussed considering the involved technological challenges.
Tendencies in Multi-Span Large Deck Construction with Cast in Situ Process Keywords:
Tendencies in Multi-Span Large Deck Construction with Cast in Situ Process authors
Pedro Pacheco
PhD, CEO, BERD, Matosinhos, Portugal
Hugo Coelho
Structural Engineer, Head of Engineering & Production Department, BERD, Matosinhos, Portugal
André Resende
Structural Engineer, Engineering & Production Department, BERD, Matosinhos, Portugal
Diogo Carvalho
Structural Engineer, Engineering & Production Department, BERD, Matosinhos, Portugal