Modeling a novel resource-constrained project scheduling problem
Publish place: دومین کنفرانس بین المللی مدیریت و مهندسی صنایع
Publish Year: 1394
نوع سند: مقاله کنفرانسی
زبان: English
View: 734
This Paper With 9 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
ICMI02_186
تاریخ نمایه سازی: 26 شهریور 1395
Abstract:
This paper provides mathematical analysis for a resource-constrained project scheduling problem in two folds: mathematical formulation, and algorithm development. Correspondingly, the problem has some special assumptions such as (i) resources need a lag time after each use in order to have recovery/service, (ii) each activity can be compressed, and (iii) project available budget is limited. This problem is rarely analyzed in the literature especially for the case of dedicated resources, while we develop a special-purpose algorithm that defeats general-purpose solver Lingo 11.0 on different test problems. The proposed algorithm uses problem characteristics in the form of guiding rules efficiently. At the end, computational experiences are reported.
Keywords:
Authors
B Shah-Hoseini
Department of Industrial Engineering, Islamic Azad University, South Tehran Branch, Tehran, Iran
S.M.T Fatemi Ghomi
Full professor, Faculty of Industrial Engineering & Management Systems, Amirkabir University of Technology-Tehran Polytechnic, Tehran, Iran
M Karimi-Nasab
Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran
Moeen Sammak Jalali
PhD Candidate, Faculty of Industrial Engineering & Management Systems, Amirkabir University of Technology-Tehran Polytechnic, Tehran, Iran