Applying System Approach to the Project Scheduling Problem
Publish place: 9th International Industrial Engineering Conference
Publish Year: 1391
نوع سند: مقاله کنفرانسی
زبان: English
View: 1,544
This Paper With 7 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
IIEC09_032
تاریخ نمایه سازی: 26 اسفند 1391
Abstract:
In the real world, project scheduling problems are affected by complexity. Studying an NP-hard scheduling problem is a difficult task, particularly for the problems with high degree of size and complexity. Project scheduling problem is an inherently multi-objective problem since managers want to finish projects as soon as possible with the minimum cost and the maximum quality. In this paper we introduce the most common objective functions in the project scheduling problem. We try to provide a system approach to this problem in order to analyze factors and main objectives in interaction with each other. To reach this goal Vensim software is used to apply system approach to the problem. We propose a causal diagram to illustrate connections and a flow diagram for a selected problem. Finally, results of two scenarios proposed are analyzed
Keywords:
Authors
Maliheh Majidzadeh
Alzahra University
Jafar Bagherinejad
Assistant Professor, Industrial Engineering Department
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :