Solving Critical Path Problem in Project Network by a New Enhanced Multi-objective Optimization of Simple Ratio Analysis Approach with Interval Type-2 Fuzzy Sets
Publish Year: 1396
نوع سند: مقاله ژورنالی
زبان: English
View: 405
This Paper With 10 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_IJE-30-9_008
تاریخ نمایه سازی: 23 دی 1396
Abstract:
Decision making is an important issue in business and project management that assists finding the optimal alternative from a number of feasible alternatives. Decision making requires adequate consideration of uncertainty in projects. In this paper, in order to address uncertainty of project environments, interval type-2 fuzzy sets (IT2FSs) are used. In other words, the rating of each alternative and weight of each criterion are expressed by IT2FSs. Moreover, for obtaining weights of criteria, interval type-2 fuzzy analytic hierarchy process (AHP) method is employed. In addition, a new enhanced model of multi-objective optimization on the basis of simple ratio analysis (MOOSRA) method is developed with IT2F-relative preference relation. Finally, to illustrate applicability of the introduced approach, an existing application from literature is adopted and solved
Keywords:
Project Critical Path Problem , Relative Preference Relation , Interval Type-2 Fuzzy Sets , Multi-objective Optimization of Simple Ratio Analysis Method ,
Authors
Y Dorfeshan
Department of Industrial Engineering, Faculty of Engineering, Shahed University, Tehran, Iran
S.M Mousavi
Department of Industrial Engineering, Faculty of Engineering, Shahed University, Tehran, Iran
B Vahdani
Department of Industrial Engineering, Faculty of Industrial and Mechanical Engineering, Qazvin Branch, Islamic Azad University, Qazvin, Iran
V Mohagheghi
Department of Industrial Engineering, Faculty of Engineering, Shahed University, Tehran, Iran