Techno-economic Feasibility Study of the Gunde Teklehaymanote Micro-hydropower Plant at Tindwat River, Central Gondar, Ethiopia

Publish Year: 1399
نوع سند: مقاله ژورنالی
زبان: English
View: 251

This Paper With 7 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_IJEE-11-2_006

تاریخ نمایه سازی: 19 مرداد 1399

Abstract:

Ethiopia has a high potential for water for hydro-power development. Even though there is untapped potential, the country s electricity coverage is poor. This paper presents a technical-economic feasibility study of gunde micro hydropower at the Tindwat River, Central Gondar, Ethiopia. In the techno-economics study, the analysis was made for energy modeling, economic scenarios, and sensitivity, risk, and emission analyses. The study shows that this mini-hydropower project can be developed with an installed power of 18 kW, where the Kaplan turbine is recommended. The construction of small scale hydropower in the tindwat river is technically and economically feasible with total net present cost of US $ 253537, cost of energy $0.09/kWh, simple payback period of 6.9 years, and internal rate of return 23.9%. Te result also shows that construction of hydropower curtails greenhouse gas emissions of carbon dioxide by 588.65m3 of gasoil per year. It also showed that small hydroelectric power generation from Tindwat River would improve the electricity supply to Gunde Teklehaymanote monstery and off-grid rural communities.

Authors

A. K. Belay

Mechanical Engineering Department, Institute of Technology, University of Gondar, Gondar, Ethiopia

D. Atenafu

Hydraulics Engineering Department, Institute of Technology, University of Gondar, Gondar, Ethiopia

S. Birhan

Electrical and Computer Engineering Department, Institute of Technology, University of Gondar, Gondar, Ethiopia

T. Tegengn

Mechanical Engineering Department, Institute of Technology, University of Gondar, Gondar, Ethiopia