Simulation and Economic Analysis of Combined Desalinated Water and Power Generation from Associated Gases of Cheshmeh Khosh

Publish Year: 1400
نوع سند: مقاله ژورنالی
زبان: English
View: 247

This Paper With 14 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_IJOGST-10-1_001

تاریخ نمایه سازی: 23 خرداد 1400

Abstract:

Flaring of gas often having high heating value results in considerable economic and energy losses in addition to significant environmental impacts. Power generation through combined gas and steam turbine cycles may be considered as a suitable flare gas recovery process. Thermal sea-water desalination is a process that requires a considerable amount of heat; hence it may be used in downstream of power generation cycles. Energy is the largest section of the water generation cost of all desalination processes. The energy cost of thermal distillation sea-water plants is close to ۵۰-۶۰% of water generation costs. In the current study, the generation of power and desalinated water through the gas turbine cycle, steam cycle, and multistage flash (MSF) method using flare gas of cheshmeh khosh are investigated. The economic parameters related to the different scenarios considered for the production of power and water are evaluated in the current research. According to the economic evaluation carried out, the most economically profitable scenarios for the investigated co-generation plant is generating as much as possible power in the steam turbine and using the remaining heat in the low-pressure outlet steam in the MSF desalination process. The results show that by increasing steam turbine outlet pressure from ۳ bar to ۷۸ bar, power and water generation is changed from ۶۹۷ to ۵۸۱ MW and ۱۵۵۷ to ۲۱۰۹ m۳/h, respectively. Also, by increasing the outlet pressure of the steam turbine from ۳ to ۷۸ bar, the total capital cost is changed from ۱۱۷۷ to ۱۱۹۲ MUSD, and the operating cost is changed from ۱۱۷.۸۵ to ۱۱۷ MUSD/year. Finally, operating profit will decrease from ۳۰۰ to ۵۰ MUSD/year, and payback time will change from ۳.۹۲ to ۴.۷۵ years.

Authors

Amirhossein Khalili-Garakani

Assistant Professor, Chemistry and Process Engineering Department, Niroo Research Institute, Tehran, Iran

Mahya Nezhadfard

Research Assistant, Chemistry and Process Engineering Department, Niroo Research Institute, Tehran, Iran

Mostafa Jafari

Ph.D Student, School of Chemical Engineering, University of Tehran, Tehran, Iran