Solving Bi-objective Single machine scheduling under uncertainty by two stage GA
Publish place: 2nd International Conference on Challenges and New Solutions in Industrial Engineering and Management and Accounting
Publish Year: 1400
نوع سند: مقاله کنفرانسی
زبان: English
View: 342
This Paper With 6 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
CSIEM02_489
تاریخ نمایه سازی: 27 تیر 1400
Abstract:
Generating a robust and stable schedule becomes a bi-objective optimization problem. In this paper, by defining robustness as expected total tardiness and stability as the sum of expected variances/ squared differences of the job completion times, a bi- objective problem of finding robust and stable for single machine scheduling in uncertainenvironment of machine breakdowns and job processing times variability, is formulated. To solve this Np-hard problem, a two stage GA algorithm is proposed.
Keywords:
Authors
Zeinab Abtahi
Ph.D. industrial engineering, PhD in Industrial Engineering, Faculty of Engineering, Lorestan University, Khorramabad, Iran