Solving Bi-objective Single machine scheduling under uncertainty by two stage GA

Publish Year: 1400
نوع سند: مقاله کنفرانسی
زبان: English
View: 342

This Paper With 6 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

CSIEM02_489

تاریخ نمایه سازی: 27 تیر 1400

Abstract:

Generating a robust and stable schedule becomes a bi-objective optimization problem. In this paper, by defining robustness as expected total tardiness and stability as the sum of expected variances/ squared differences of the job completion times, a bi- objective problem of finding robust and stable for single machine scheduling in uncertainenvironment of machine breakdowns and job processing times variability, is formulated. To solve this Np-hard problem, a two stage GA algorithm is proposed.

Authors

Zeinab Abtahi

Ph.D. industrial engineering, PhD in Industrial Engineering, Faculty of Engineering, Lorestan University, Khorramabad, Iran