Solution for Sand Production Problem in Oil and Gas well

Publish Year: 1400
نوع سند: مقاله کنفرانسی
زبان: English
View: 189

This Paper With 5 Page And PDF and WORD Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

MEECONF02_019

تاریخ نمایه سازی: 20 شهریور 1400

Abstract:

In formations where the sand is porous, permeable and well cemented together, large volumes of hydrocarbons which can flow easily through the sand and into production wells are produced through perforations into the well. These produced fluids may carry entrained there in sand, particularly when the sub surface formation is an unconsolidated formation. Produced sand is undesirable for many reasons. When it reaches the surface, sand can damage equipment such as valves, pipe lines, pump sand separators and must be removed from the produced fluids at the surface. Further, the produced sand may partially or completely clog the well, substantially lead to poor performance in wells and, ultimately, inhibiting production, there by making necessary an expensive work-over. In addition, the sand flowing from the subsurface formation may leave therein a cavity which may result in caving of the formation and collapse of the casing. Sand entering production wells is one of the oldest problems faced by oil companies and one of thetoughest to solve. Production of sand during oil production causes severe operational problem for oil producers. Several techniques have been used for sand production control in sandstone reservoirs. These techniques are divided into four groups including; standard rig operation with retrievable packer; tubing-conveyed string; coiled tubing and long zone/selective treatment. Several consolidating materials, such as, crude oil coke and nickel plating, have been used in the past by researchers At present, the chemical binders, such as; phenol resin, phenol formaldehyde, epoxy, and furan or phenol furfural provides cementation. In this paper, we discuss sand control method for an oil well

Authors

Mohammad Daneshi

Project Superviser of Drilling Engineering and Planning of the National Iranian Drilling Company

Mehran Makavandi

Deputy Managing Director of the National Iranian Drilling Company