FUZZY APPROACH TO PROJECT DELIVERY SYSTEM SELECTION abstract

Since variety of construction projects with their individual specifications could be handled through different procurement systems, selection of the most appropriate project delivery system is a vital step towards more efficient project execution as well as competent management of the project. The appropriate selection of project delivery system not only influences first stages of the project, but it could also impact pre-construction, construction and operational phases of the project. Among different approaches exerted for this purpose, none has taken uncertainty into account, despite the fact that during first stages of the project most of the selection factors are not clearly defined. This paper, hence, aims to have a fuzzy insight into the project delivery system selection so as to provide more tangible model of the evaluation process. Proposed fuzzy method is indeed a multi criteria decision making model, based on the group of criteria assigned for the evaluation procedure. A case study is also conducted, based on the opinion of an invented group of the experts.

FUZZY APPROACH TO PROJECT DELIVERY SYSTEM SELECTION Keywords:

FUZZY APPROACH TO PROJECT DELIVERY SYSTEM SELECTION authors

Nader Naderpajouh

Graduated Student , Iran University of Science and Technology – Tehran – Iran

Farnad Nasirzadeh

PhD Candidate , Iran University of Science and Technology – Tehran – Iran

Abbas Afshar

Professor , Iran University of Science and Technology – Tehran – Iran

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
اسفند ماه1385 _ _ Fehruary WW. _ ...
Gordon C.M., (1992). "Choosing Appropriate Construction Contracting Method.", J. Constr. ...
Cheung S., Lam T. (2001). "Improving Objectivity Procurement Selection." J. ...
Oyetunji _ A., Anderson S.D. (2006). "Relative Effectiveness of Project ...
Alhazmi, T., McCaffer R., (2000). "Project Procurement System Selection Model." ...
Watson S. R. et al. Jan. (1979). "Fuzzy Decision Analysis." ...
Paek J. H., and Lee Y. W., and Napier T. ...
Lee Y. W., and Bogardi I., and Stansbury J. (1991). ...
Chen S.J., and Hwang, C.L. (1992). "Fuzzy Multiple Attribute Decision ...
Chen, S. H. (1985). "Ranking fuzzy sets with maximizing set ...
Zimmermann, H. J. (2001). "Fuzzy Set Theory and it's Application." ...
نمایش کامل مراجع