Modeling Effective Indicators of Construction Projects Using Fuzzy TOPSIS Method
Publish place: 5th Symposium on Advances in Science and Technology
Publish Year: 1390
نوع سند: مقاله کنفرانسی
زبان: English
View: 1,414
This Paper With 7 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
SASTECH05_100
تاریخ نمایه سازی: 22 مرداد 1391
Abstract:
Recently growing rate of construction projects caused to expanse of construction industries.Unfortunately recent increasing demand on construction projects caused projects which do not matchappropriately with construction industry's approaches and this caused delays in a part and sometimes whole of the projects. This will take into consideration when we understand that a large amount of national expenditures includes construction projects costs. These delays cause damages intoinfrastructure. Recently using fuzzy methods and multiple attribute decision making have become usual for help of managing and efficiency construction in worldwide .these methods are based on fundamental indicators by putting them in phase category and grading them decision making is done. Thus this paper surveys and explains four common approaches in construction projects and finally by using fundamental indicators in project delays these approaches will be graded by Fuzzy TOPSIS methods and Multiple Attribute Decision Making (MADM).
Keywords:
Authors
S Nemati
QIAU’s member of Scintific Assembly
A Yavari
QIAU’s student of Civil Engineering
S Shirafkan
QIAU’s student of Master of Bisuness Administration
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :