Pile Length Optimization in Fixed Template Offshore Platform Using Risk Reduction Approach
Publish place: International Journal of Coastal, Offshore and Environmental Engineering، Vol: 6، Issue: 4
Publish Year: 1400
Type: Journal paper
Language: English
View: 174
This Paper With 11 Page And PDF Format Ready To Download
- Certificate
- I'm the author of the paper
Export:
Document National Code:
JR_IJCOE-6-4_005
Index date: 19 June 2023
Pile Length Optimization in Fixed Template Offshore Platform Using Risk Reduction Approach abstract
The purpose of risk management is managing the uncertainties by considering activities for identifying, assessing, monitoring, and reducing the impact of risks. Three strategies may be used to deal with the kind of risks that exist in projects: risk acceptance, risk transfer, and risk reduction. Events that can affect the economical goals of a project must be identified and evaluated so that they can be appropriately managed. Fixed jacket-type offshore platform (JTOP) as an expensive and necessary structure in energy facilities. in this research, the effect of knowledge increasing on the risk reduction and cost optimization for JTOP is studying. This paper focuses on optimizing the pile length of the fixed jacket-type offshore platforms and reducing the conservative design by using the risk reduction approach. Fixed offshore platform in South Pars Gas Fields of Iran as a case study.Increasing the Geotechnical knowledge and reducing the pile lengths is performed as considering similar geotechnical study at this regions and pile dynamic driving test (PDA), updating the pile bearing capacity base on increased knowledge for geotechnical data, and finally assessing the result based on inplace analyzing Pile driving result shows increasing the longterm soil bearing capacity, So first of all the required strength and parameters extracted from the existing data with analyzing and comparing where to adjust and matches with the lower limit of the theoretical equations. Finally, this new assumption is used for optimizing the pile length design. This research shows that that the numerical analysis and assumptions that have been used in the design procedure are conservative and a proper risk management program with the knowledge increasing could have resulted in risk reduction. The analysis process that has been used in the present research leads to the pile cost reduction by 11% that is considerable for stakeholders in such an expensive structure. The most important innovation in this paper is the use of the results of pile driving operation for optimal pile design because, in pile driving operation, piles with design diameter are used.
Pile Length Optimization in Fixed Template Offshore Platform Using Risk Reduction Approach Keywords:
Pile Length Optimization in Fixed Template Offshore Platform Using Risk Reduction Approach authors
zahra omrani
Ph.D. student of university of Qom
Rouhollah Amirabadi
Assistant professor, University of Qom
Mahdi Sharifi
۳Assistant Professor, University of Qom
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :