Sustainability Analysis of Waste Dump in Mine No. 4 of Golgohar, Sirjan, for Purpose of Increasing Waste Dump Volume

Publish Year: 1402
Type: Journal paper
Language: English
View: 220

This Paper With 19 Page And PDF Format Ready To Download

Export:

Link to this Paper:

Document National Code:

JR_JMAE-14-4_020

Index date: 5 October 2023

Sustainability Analysis of Waste Dump in Mine No. 4 of Golgohar, Sirjan, for Purpose of Increasing Waste Dump Volume abstract

The stability of waste dumps is a significant and at times critical issue in the development of surface mines. Due to insufficient space for waste disposal, environmental concerns, and various other factors, Mine No. 4 at Golgohar Sirjan is not capable of establishing a new waste dump. Given the existing limitations of the mine, the investigation has focused on increasing the dump capacity through the implementation of benches. In this research work, the stability of the waste dump has been investigated using the limit equilibrium method with the Slide3D software, along with a Monte Carlo simulation approach for probabilistic analysis. The results obtained from these methods have been compared with each other. The acceptable safety factor considered for this assessment ranges from 1.15 to 1.2. By adding benches to the eastern waste dump of the mine, a displaced volume equivalent to 36,715.565 cubic meters has been added to the capacity. The constructed model is based on the topography of the area, with dimensions of 1850 meters in length, 1750 meters in width, and 160 meters in height. The results indicate that the safety factor of the waste dump has been calculated as follows using the Spencer, Janbu, and Bishop methods respectively: 1.26, 1.199, and 1.226. Mine No. 4 needs to extract 983.58 million tons of waste to produce 73 million tons of iron ore. In total, by discharging 428 million tons of waste in the northeastern and eastern dumps and adding a bench, a volume of 555.571 million tons of waste is available for disposing of the remaining waste. Considering the remaining waste volume, space must be allocated for waste disposal to Mine No. 4.

Sustainability Analysis of Waste Dump in Mine No. 4 of Golgohar, Sirjan, for Purpose of Increasing Waste Dump Volume Keywords:

Sustainability Analysis of Waste Dump in Mine No. 4 of Golgohar, Sirjan, for Purpose of Increasing Waste Dump Volume authors

Sajjad Rezaei

Faculty of Mining, Petroleum & Geophysics Engineering, Shahrood University of Technology, Shahrood, Iran.

Ramin Rafiee

Faculty of Mining, Petroleum & Geophysics Engineering, Shahrood University of Technology, Shahrood, Iran.

Mohammad Ataei

Faculty of Mining, Petroleum & Geophysics Engineering, Shahrood University of Technology, Shahrood, Iran.

Morteza Javadi

Faculty of Mining, Petroleum & Geophysics Engineering, Shahrood University of Technology, Shahrood, Iran.

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
. Igwe, O., & Chukwu, C. (۲۰۱۸). Evaluation of the ...
. Rosta, M. (۲۰۱۴). Master's thesis: "Determination of Geomechanical Properties ...
. López-Vinielles, J., Fernández-Merodo, J. A., Ezquerro, P., García-Davalillo, J. ...
. Kainthola, A., Verma, D., Gupte, S. S., & Singh, ...
. Adamczyk, J., Cała, M., Flisiak, J., Kolano, M., & ...
. Coulibaly, Y., Belem, T., & Cheng, L. (۲۰۱۷). Numerical ...
. Zou, P., Zhao, X., Meng, Z., Li, A., Liu, ...
. Shamsuddin Saeed, M., Mohammadi, H., Heydari Rad, A.,and Zare, ...
. Nguyen, P. M. V., Wrana, A., Rajwa, S., Różański, ...
. Sarpong, S. O., Olaleye, B. M., Kunkyin-Saadaari, F., & ...
. Vishvakiran, B. (۲۰۲۳) “A study on stability analysis of ...
. Iranian Sirjan Steel Company (۲۰۱۶), design and planning of ...
. Iranian Sirjan Steel Company (۲۰۲۲) design and planning of ...
. Interview with Dr. Peyman Ahmadian, July ۲۰۲۳ ...
. The program for the preparation of mining standards and ...
. Manafi Qarabai M, Noorzad A, Mahdavifar M (۲۰۱۲) "Risk ...
. Johari A, Zarang Thani F, Parvez M (۲۰۱۱), "Reliability ...
. Iranian Sirjan Steel Company (۲۰۲۱) Probabilistic analysis of the ...
. Soroush A and Warss Vazirian A (۲۰۰۴), "Using probabilistic ...
. Rockscience, (۲۰۰۷) "Slide v.۶", User manuals ...
. Najafi M and Yarahmadi Bafqi A (۲۰۰۸), "Reliability Analysis ...
نمایش کامل مراجع