Automatic under Voltage Load Shedding and Automatic Switching of Bus Reactors for Mitigating Fault Induced Delayed Voltage Recovery

Publish Year: 1396
نوع سند: مقاله ژورنالی
زبان: Persian
View: 82

This Paper With 7 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_SAIRAN-8-2_015

تاریخ نمایه سازی: 9 آبان 1402

Abstract:

This paper presents the application of automatic under voltage load tripping and switching of shunt reactors as counter measures for fault induced delayed voltage recovery (FIDVR). As dynamic behavior of loads has significant impact on simulating FIDVR, proper load modeling is also discussed in this paper. Simulations conducted on actual network show that the proposed load model is effectively able to simulate FIDVR. It also shown that automatic under voltage load shedding and switching of shunt reactors can be used as counter measures for reducing risk of voltage collapse or over voltage conditions that may take place following load tripping caused by FIDVR.

Keywords:

Induction motor , under voltage load shedding , Bus reactor , Air conditioner , Fault induced delayed voltage recovery

Authors

فرزان رشیدی

دانشگاه هرمزگان- دکترای برق

حسن فراهانی

دکترا- هیات علمی دانشگاه آزاد اسلامی واحد اشتیان