Developed a new fuzzy approach for solving two-machine flow shop scheduling problems under fuzziness

Publish Year: 1402
نوع سند: مقاله ژورنالی
زبان: English
View: 23

This Paper With 10 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_CAND-2-4_001

تاریخ نمایه سازی: 9 اردیبهشت 1403

Abstract:

The current study investigates a two-machine Flow Shop Scheduling (FSS) problem with piecewise quadratic fuzzy processing time. It is illogical to consider that the processing time is exact but uncertain because it varies due to human factors. One of the most popular approximate intervals, namely, close interval approximation for the Piecewise Quadratic Fuzzy Number (PQFN), is introduced. A solution method with the help of Johnson's algorithm [۱], the close interval approximation of PQFNs, and the modified McCahon and Lee's algorithm [۲] is developed to determine the minimization of the expected makespan. Numerical experimentation is performed to demonstrate the effectiveness of the suggested methodology.

Keywords:

Authors

Hamiden Khalifa

Department of Mathematics, College of Science and Arts, Qassim University, Al-Badaya ۵۱۹۵۱ Saudi Arabia.

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • Johnson, S. M. (۱۹۵۴). Optimal two‐ and three‐stage production schedules ...
  • McCahon, C. S., & Lee, E. S. (۱۹۹۰). Job sequencing ...
  • Morton, T. E., & Pentico, D. W. (۱۹۹۳). Heuristic scheduling ...
  • Agrawal, S., Gautam, A., Chauhan, D. K., Tiwari, L. M., ...
  • Vahedi-Nouri, B., Fattahi, P., Tavakkoli-Moghaddam, R., & Ramezanian, R. (۲۰۱۴). ...
  • Ren, T., Guo, M., Lin, L., & Miao, Y. (۲۰۱۵). ...
  • Laribi, I., Yalaoui, F., Belkaid, F., & Sari, Z. (۲۰۱۶). ...
  • Yazdani, M., & Naderi, B. (۲۰۱۶). Modeling and scheduling no-idle ...
  • Qu, C., Fu, Y., Yi, Z., & Tan, J. (۲۰۱۸). ...
  • Zadeh, L. A. (۱۹۶۵). Fuzzy sets. Information and control, ۸(۳), ...
  • Bellman, R., & Zadeh, L. (۱۹۷۰). Decision-making in a fuzzy ...
  • Dubois, D. J., & Prade, H. (۱۹۸۰). Fuzzy sets and ...
  • Panda, A., & Pal, M. (۲۰۱۵). A study on pentagonal ...
  • Yager, R. R. (۱۹۸۱). A procedure for ordering fuzzy subsets ...
  • Litoiu, M., & Tadei, R. (۲۰۰۱). Fuzzy scheduling with application ...
  • Yao, J. S., & Lin, F. T. (۲۰۰۲). Constructing a ...
  • Hejazi, S. R., Emami, S., & Arkan, A. (۲۰۰۹). A ...
  • Ishibuchi, H., Murata, T., & Lee, K. H. (۱۹۹۶). Formulation ...
  • Temiz, I., & Erol, S. (۲۰۰۴). Fuzzy branch-and-bound algorithm for ...
  • Ignall, E., & Schrage, L. (۱۹۶۵). Application of the branch ...
  • Gupta, D., Aggarwal, S., & Sharma, S. (۲۰۱۲). A Fuzzy ...
  • González-Neira, E. M., Montoya-Torres, J. R., & Barrera, D. (۲۰۱۷). ...
  • Komaki, G. M., Sheikh, S., & Malakooti, B. (۲۰۱۹). Flow ...
  • Janaki, E., & Mohamed Ismail, A. (۲۰۲۰). Flow shop scheduling ...
  • Khalifa, H. A. (۲۰۲۰). On single machine scheduling problem with ...
  • Abd El-Wahed Khalifa, H., Alodhaibi, S. S., & Kumar, P. ...
  • Alharbi, M. G., & El-Wahed Khalifa, H. A. (۲۰۲۱). On ...
  • Alburaikan, A., Garg, H., & Khalifa, H. A. E. W. ...
  • Ren, J., Ye, C., & Yang, F. (۲۰۲۱). Solving flow-shop ...
  • Wang, C. N., Hsu, H. P., Fu, H. P., Phan, ...
  • Wang, C. N., Porter, G. A., Huang, C. C., Nguyen, ...
  • Jemmali, M., & Hidri, L. (۲۰۲۲). Hybrid flow shop with ...
  • Koulamas, C., & Kyparisis, G. J. (۲۰۲۲). Flow shop scheduling ...
  • Jain, S. (۲۰۱۰). Close Interval Approximation of Piecewise Quadratic Fuzzy ...
  • نمایش کامل مراجع