Abstract:

It was concluded at the conference on World Energy Outlook 2011 in London, that global warming is the main threat for future generations. It is predicted that earth’s temperature may rise by 6.4 ◦C in the next century compared to only 0.74◦C in the past century. Maria van der Hoeven, director and representative of International Atomic Energy Agency (IAEA) at this conference stated that IEA insists that governments of the world invest in technologies which are CO2 efficient. In a report published by IAEA called ‘Climate Change and Nuclear Power 2011’ concluded that nuclear power can battle the future climate change.Iran is one of the few fortunate countries in the world which has access to vast uranium deposits while successfully has developed technology to enrich its uranium to produce nuclear rods to fuel its required nuclear energy for its future generations, however, considering that the existing Bushehr power plant was designed about half a century ago, it would be useful to learn from Fukushima plant disaster.After two weeks of frequent seismic preshocks, on 11th March 2011 at 2.46 pm a magnitude 8.9 earthquake strike Japan's north-eastern coast, triggering a devastating tsunami and a series of aftershocks, the reactors automatically shut down with the earthquake. At 3.15pm a tsunami of 15m height which was twice the height of sea ward walls followed the earthquake directly from the east, the back up generators which provided water to stop nuclear rods from melting could not operate as they were submerged under water as they were located in the basement. Tokyo Electricity Company (Tepco), the owner of the plant, had already been warned by the scientists that the seaward walls were not tall enough and required retrofitting, but this was ignored, as the result the tsunami had over passed the wall1.On 12th March a state of emergency was declared about 170,000 people were evacuated from 18 km zone around the Fukushima plant. On17th March Japanese helicopters dump tons of water over the plant in an attempt to cool reactors, but had no success. On 22nd March 2011 Japan expanded the exclusion zone around the plant and asked a further 130,000 residents to evacuate.The paper investigates the retrofitting options which could have been applied to Fukushima plant to prevent the catastrophe which has resulted in possible contamination of 200 km2 of North East of Japan for the next two decades.

Authors

J Motamed

BSc MSc PhD MCS MCIOB.

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • -This World: Inside the Meltdow. The inside story of the ...
  • -:Fukushima: la tem eprature des r' eacteurs est stabilis ee ...
  • -"Une partie du b' eton de 1'enceinte de Fukushima rong ...
  • -:Toutes les installations nucl eaires devont subir des tests de ...
  • -Newsnight, BBC2 programme on the anniversary of Fukushimal 1 March ...
  • - Motamed, J. "Monolithic beam to external column joints in ...
  • Malla, R. "Investigation of crack propagation in fibre reinforced cocrete ...
  • -Al-Hussaini, A. and Motamed, J., _ beams with combination oflinks ...
  • -Motamed, J., Al-Hussaini, A. and Alani, A.M., "Shear design of ...
  • نمایش کامل مراجع