Events' Analysis in Project Networks with Fuzzy Activity Times: An Applicable Approach
Publish place: 4th International Project Management Conference
Publish Year: 1387
نوع سند: مقاله کنفرانسی
زبان: English
View: 2,268
This Paper With 13 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
IPMC04_149
تاریخ نمایه سازی: 8 دی 1386
Abstract:
A new approach is presented to solve the project scheduling problem under fuzzy environment. Two LP models are used in order to calculate the earliest and latest events times. Utilizing fuzzy activity times in the project network will change the models to fuzzy forms which by utilizing
Yager's ranking method, will be transformed to crisp ones. The transformed models can be solved by conventional solution methods. In this paper, we define the events’ criticality and the relative paths’ degree of criticality. The activity’s slack times help project manager to decide according to the practical applications and manage the project efficiently. In the other hand, the proposed approach is easy to use and simple to apply. Finally, through a numerical example, the validity of proposed method is confirmed.
Keywords:
Authors
Abalfazl Zareei
Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran
Farzad Zaerpour
Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran
Roya Ekrami
Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :