The Cost-Benefit Analysis of AlPSim and two other project for Optimization Consumption energy(Almahdi Hormozal Aluiminium smelter Case Study)
Publish place: 4th Iran Aluminum International Conference IIAC2016
Publish Year: 1395
نوع سند: مقاله کنفرانسی
زبان: English
View: 502
This Paper With 7 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
IIAC04_024
تاریخ نمایه سازی: 22 دی 1396
Abstract:
AlPSim is a Simulating model which is used for calculation of aluminum electrolysis properties (same as Electrical Conductivity, Electrolyte Viscosity, Electrolyte Density, Aluminum Density, Max Alumina Solubility in Electrolyte, Max aluminum Solubility in Electrolyte and Liquids Temperature) in order to optimize operational parameter in aluminum production systems.and the other project 3-D thermo-electrical model for an aluminium reduction cell is developed and the effect of operational parameters on the thermo-electrical characteristics of the cell is studied. And to another project Due to the need to collect daily data from pots, the design and construction of Vm (and Thermocouple) with high accuracy is proposed.The purpose of this study is to propose a Plans of Management Energy In the aluminum industry, and explore the possibility of the project is financially. In this study In this paper the construction period of a year, a 16 percent discount rate, net present value and rate of return on plan net Internal. According to the results based on costs and revenues, This plan is quite justified financially.
Authors
Maryam gobadi
Department of Economic Sciences,Tarbiat modares university,Tehran. P.O. Box: ۱۴۱۱۵۳۱۷., Iran
Alireza naseri
Department of Economic Sciences,Tarbiat modares university,Tehran. P.O. Box: ۱۴۱۱۵۳۱۷., Iran
Borzu bahrvand
Almahdi-Hormozal Aluminium Smelter, Bandar abass, P.O. Box:۷۹۱۷۱-۷-۶۳۸۵, Iran
Mohsen ameri siahooei
Almahdi-Hormozal Aluminium Smelter, Bandar abass, P.O. Box:۷۹۱۷۱-۷-۶۳۸۵, Iran