سیویلیکا را در شبکه های اجتماعی دنبال نمایید.

Comparing Methods of Ramp Metering for On-Ramps to Improve the Operational Conditions at Peak Hours

Publish Year: 1396
Type: Journal paper
Language: English
View: 382

This Paper With 18 Page And PDF Format Ready To Download

Export:

Link to this Paper:

Document National Code:

JR_IJTE-5-3_006

Index date: 11 November 2018

Comparing Methods of Ramp Metering for On-Ramps to Improve the Operational Conditions at Peak Hours abstract

This paper aims to evaluate and compare the effects of different methods of ramp metering on the operational conditions of traffic flow at three levels: the network level (including the freeway and its connected ramps), the entrance ramp, and the upstream segment of the entrance. To achieve this aim, one of the most important urbanfreeways in the metropolis of Isfahan was selected. The traffic volume passing through this freeway and its connected ramps were determined during peak hours (7 to 9 am), and the south band flows were simulated using microscopic analysis in AIMSUN software. After calibration and validation of the model, a specific on-ramp (the entrance rampof Samadiyeh) was reviewed as the selected ramp, by using the fixed-time plan and ALINEA algorithm at demand levels of 100%, 110% and 80%. The results indicate that for normal demand level (100% demand), ramp metering does not have a significant effect on traffic flow. Further, ramp metering significantly improved upstream traffic flowin the freeway at high demand levels (110% demand), indicating its usefulness at high demand levels. At this demand level, ramp metering leads to traffic flow deviation. At low demand (80% demand), ramp metering increased the delay time of both the freeway and the ramp, indicating the ineffectiveness of ramp metering at low demands

Comparing Methods of Ramp Metering for On-Ramps to Improve the Operational Conditions at Peak Hours Keywords:

Comparing Methods of Ramp Metering for On-Ramps to Improve the Operational Conditions at Peak Hours authors

Babak Mirbaha

Assistant Professor, Dept. Civil Engineering, Imam Khomeini International University, Qazvin, Iran

Ghodrat Eftekhari

PH.D Student, Dept. Civil Engineering, Imam Khomeini International University, Qazvin, Iran

Sajjad Hasanpour

PH.D Student, Dept.Civil Engineering, Imam Khomeini International University, Qazvin, Iran