Investigating and prioritizing failure indicators of BIM-based automated construction in Iran using FAHP method

Publish Year: 1397
نوع سند: مقاله کنفرانسی
زبان: English
View: 367

This Paper With 14 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

CAUM01_0078

تاریخ نمایه سازی: 25 اردیبهشت 1398

Abstract:

Nowadays, using modern methods for optimization of time-cost-quality in construction projects have gained a great attention from construction engineers and stakeholders. Building Information Modeling (BIM) is one of these new methods which is a process involving the generation and management of digital representations of physical and functional characteristics of buildings. In the present study, the procedure of BIM was analyzed and challenging factors affecting implementation of this method in Iran were investigated. Here, we specified the failure factors in the implementation of BIM system according to experts’ opinions and through a questionnaire, and by using the FAHP model, the weight and importance of these factors were determined and also, the factors were prioritized. Results indicated that, in terms of weight, technical issues have the greatest impact. Financial issues and time are at the second and third levels respectively, while training and management has the least impact in BIM implementation

Keywords:

Building Information Modeling (BIM) , Fuzzy Analytic Hierarchy Process (FAHP) , Failure Factors , questionnaire.

Authors

Mohammad Hasan Sebt,

Associate Professor, Department of Civil and Environmental Engineering, Amirkabir University of Technology, Tehran, Iran

Ashkan Golpour Marzouni

Graduate Research Assistant, Department of Civil and Environmental Engineering, Amirkabir University of Technology, Tehran, Iran