The Preemptive Just-in-time Scheduling Problem in a Flow Shop Scheduling System
Publish Year: 1398
Type: Journal paper
Language: English
View: 692
This Paper With 14 Page And PDF Format Ready To Download
- Certificate
- I'm the author of the paper
Export:
Document National Code:
JR_JOIE-12-2_007
Index date: 11 June 2019
The Preemptive Just-in-time Scheduling Problem in a Flow Shop Scheduling System abstract
Flow shop scheduling problem has a wide application in the manufacturing and has attracted much attention in academic fields. From other point, on time delivery of products and services is a major necessity of companies’ todays; early and tardy delivery times will result additional cost such as holding or penalty costs. In this paper, just-in-time (JIT) flow shop scheduling problem with preemption and machine idle time assumptions is considered in which objective function is minimizing the sum of weighted earliness and tardiness. A new non-linear mathematical model is formulated for this problem and due to high complexity of the problem meta-heuristic approaches have been applied to solve the problem for finding optimal solution. The parameters of algorithms are set by Taguchi method. Each parameter is tested in three levels. By implementation of many problems with different sizes these levels are determined .The proposed model is solved by three meta-heuristic algorithms: genetic algorithm (GA), imperialist competitive algorithm (ICA) and hybrid of GA and ICA. To evaluate the performance of the proposed algorithms many test problems have been designed. The Computational results indicate the superiority of the performance of hybrid approach than GA and ICA in finding thebest solution in reasonable computational time.
The Preemptive Just-in-time Scheduling Problem in a Flow Shop Scheduling System Keywords:
The Preemptive Just-in-time Scheduling Problem in a Flow Shop Scheduling System authors
Javad Rezaeian
Department of industrial engineering, Mazandaran University of Science and Technology, Babol, Iran
Sadegh Hosseini-Kia
Department of Industrial Engineering, Mazandaran University of Science and Technology, Babol, Iran.
Iraj Mahdavi
Department of Industrial Engineering, Mazandaran University of Science and Technology, Babol, Iran
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :