Pharmaceutical project portfolio selection by using fuzzy AHP and fuzzy TOPSIS methodologies

Publish Year: 1398
نوع سند: مقاله کنفرانسی
زبان: English
View: 294

This Paper With 5 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

ICIORS12_154

تاریخ نمایه سازی: 24 شهریور 1398

Abstract:

By performing a suitable project portfolio selection before investment, the possibility of project success increases, due to the fact that resources are limited and DM has to decide which project should be given priority in terms of receiving critical resources. This is more sensitive in pharmaceutical industries, because they have been struggling not only to make their project economical but also to satisfy patients’requirement as soon as possible. To assess alternative projects and determine the project portfolio, we applied Fuzzy AHP and Fuzzy TOPSIS methodologies in regard to the five main criteria. The AHP is used to create appropriate weights of the criteria, and fuzzy TOPSIS method is used to obtain final ranking. Finally, applicability and validity of these methodologies are tested by a numerical example conducted in a pharmaceutical company. The results showed that the proposed structure is able to assess and select the project with the contribution of relative importance index. This approach will have potential applications in the future

Authors

Farnoush Otrodi

School of Industrial Engineering, College of Engineering, University of Yazd, Yazd, Iran

Mohammad Ali Vahdat Zad

School of Industrial Engineering, College of Engineering, University of Yazd, Yazd, Iran

Hassan Khademi Zareh

School of Industrial Engineering, College of Engineering, University of Yazd, Yazd, Iran