A Method for Measuring Transient Switching Overvoltage Case study: Electricity network of Imam Khomeini Airport City

Publish Year: 1398
نوع سند: مقاله ژورنالی
زبان: English
View: 511

This Paper With 9 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_SPRE-3-3_002

تاریخ نمایه سازی: 2 مهر 1398

Abstract:

Transient voltage increase in electricity networks is of great importance due to security of devices and insulation considerations. One of the factors which results in transient voltage increase is connection switching. This overvoltage cannot be measured and recorded via usual measurement devices. In this study, possibility of using power quality analyzer for recording and measuring transient overvoltages is studied. To this end, switching in a 20KV electricity network in Imam Khomeini airport city is simulated using EMTP-RV. Then, real switching is performed and overvoltage is measured by power analyzer. Then, these two methods are compared.

Authors

Mojtaba Rabiei

Islamic Azad University South Tehran Branch

Seyed Mohammad Hassan Hosseini

Islamic Azad UniversitySouth Tehran Branch