risk identification and evaluation in joint venture construction projects in Iran using fuzzy synthetic approach

Publish Year: 1391
نوع سند: مقاله کنفرانسی
زبان: English
View: 1,167

This Paper With 8 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

ICCE09_1125

تاریخ نمایه سازی: 7 مهر 1391

Abstract:

Joint venture jv consturction projects are opportunities in which organizaations with different levels of financial and technical competencies collaborate with each other to achieve better project performance The risks which are evolved in these kinds of projects can lead to seriouse issues which may interrupt theflow of work create delay cause cost overrum and even hinder project success. the main objective of this paper is to identify evaluate and classify risks in JV construction projects in iran in this research Qom monorail project as a JV agreement is selected for developing a project risk evaluation framework By reviewing literature and expert judgments thirty three risks are identified and categorized in three main groups internal risks project related risks and external risks .

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • G. Zhang and P.X.W. Zou. (2010), "Fuzzy Analytical Hierarchy Process ...
  • R. Kangari. (1995), "Risk management perceptions and trends of U.S. ...
  • H. Adnan, (2008), _ assessment of risk management in joint ...
  • B. Li, and R.L.K. Tiong. (1999), "Risk management model for ...
  • L.Y. Shen, G.W.C. Wu, and C.S.K. Ng. (2001), "Risk assessmen ...
  • D. Fang, M. Li, P.S. Fong, and L. Shen. (2004), ...
  • E.K. Zavadskas, Z. Turskis, J. Tamonsaitien, (2010), "Risk assessment of ...
  • Project Management Istitute, (2008), _ guide to the project management ...
  • T. Zayed, M. Amer, J. Pan. (2008), "Assessing risk and ...
  • _ International Congress _ Civil Engineering, May 8-10, 2012 Isfahan ...
  • Y.L. Xu, J.F.. Yeung, A.P.C. Chan, D.W.M. Chan, S.Q. Wang ...
  • D.W.M. Chan, M.M. Kumaraswamy. (1996). _ evaluation of construction time ...
  • Y.L. Xu, A.P.C. Chan, F.Y. Yeung. (2010). "Developing a fuzzy ...
  • نمایش کامل مراجع