سیویلیکا را در شبکه های اجتماعی دنبال نمایید.

Multi-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints

Publish Year: 1387
Type: Journal paper
Language: English
View: 212

This Paper With 10 Page And PDF Format Ready To Download

Export:

Link to this Paper:

Document National Code:

JR_IJE-21-5_006

Index date: 6 February 2022

Multi-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints abstract

This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup times embedded in the proposed model may vary in different machines based on their characteristics. This paper proposes a two-level mixed-integer programming for the given problem. By solving the presented model, the associated promising results show the effectiveness of this model for small and medium-sized problems, respectively.

Multi-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints Keywords:

Multi-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints authors

M. Bazzazi

Industrial Engineering, University of Mazandaran

F. Taheri

Industrial Engineering, University of Mazandaran

Reza Tavakkoli-Moghaddam

Industrial Engineering, University of Tehran