A Multi-Objective Location-Allocation-Routing Optimization With Time Window for Transferring Personnel From Residence to Work: A Case Study of Bistoon Power Plant
This Paper With 18 Page And PDF Format Ready To Download
- Certificate
- I'm the author of the paper
Export:
Document National Code:
Index date: 10 January 2023
A Multi-Objective Location-Allocation-Routing Optimization With Time Window for Transferring Personnel From Residence to Work: A Case Study of Bistoon Power Plant abstract
A Multi-Objective Location-Allocation-Routing Optimization With Time Window for Transferring Personnel From Residence to Work: A Case Study of Bistoon Power Plant Keywords:
A Multi-Objective Location-Allocation-Routing Optimization With Time Window for Transferring Personnel From Residence to Work: A Case Study of Bistoon Power Plant authors
Master of Industrial Engineering, Bistoon Power Plant, Kermanshah, Iran
Associate Professor, School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
Master of Industrial Engineering, Kashef Co., Tehran, Iran
مراجع و منابع این Paper: