Analyzing the Effects of Critical Risk Occurrence Probability on Time and Cost of Road Construction Projects Using a Schedule Plan
نسخه کامل این Paper ارائه نشده است و در دسترس نمی باشد
- Certificate
- I'm the author of the paper
Export:
Document National Code:
Index date: 6 March 2023
Analyzing the Effects of Critical Risk Occurrence Probability on Time and Cost of Road Construction Projects Using a Schedule Plan abstract
Analyzing the Effects of Critical Risk Occurrence Probability on Time and Cost of Road Construction Projects Using a Schedule Plan Keywords:
Analyzing the Effects of Critical Risk Occurrence Probability on Time and Cost of Road Construction Projects Using a Schedule Plan authors
Ph.D. student, Department of Civil Engineering, South Tehran Branch, Islamic Azad University, Tehran, Iran
Assistant Professor, Department of Civil Engineering, South Tehran Branch, Islamic Azad University, Tehran, Iran
Asistant Professor, Department of Industrial Engineering, Electronic Branch, Islamic Azad University, Tehran, Iran
Assistant Professor, Department of Civil Engineering, South Tehran Branch, Islamic Azad University, Tehran, Iran
Assistant Professor, Department of Mathematical, South Tehran Branch, Islamic Azad University, Tehran, Iran