سیویلیکا را در شبکه های اجتماعی دنبال نمایید.

A Chance Constrained Programming Model For Teller Scheduling

Publish Year: 1391
Type: Conference paper
Language: English
View: 1,234

This Paper With 5 Page And PDF Format Ready To Download

Export:

Link to this Paper:

Document National Code:

IIEC08_267

Index date: 27 November 2012

A Chance Constrained Programming Model For Teller Scheduling abstract

Teller scheduling has been the topic of many articles when the teaching of introductory simulation was in mind. There are some works concentrated on using probabilistic formulation of the problem But, there is a limited number of works formulating such a problem using chance constrained programming. To develop a model for teller scheduling a briefdescription of the problem is presented This is followed by a description of the mathematical model of the problem having normally distributed random variable technological coefficients. However, three distinct mathematical programming models together with their solution procedures are described

A Chance Constrained Programming Model For Teller Scheduling Keywords:

A Chance Constrained Programming Model For Teller Scheduling authors

Y ahia Zare Mehrj erdi

Associate Professor, Department oflndustrial Engineering, Yazd University, Yazd Iran

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
A.Chames and W.W. Cooper _ Chance -Constrained Programming. Management Science ...
F.S.Hillier _ Ch ance- Constrained Programming with 0-1 _ Bounded ...
S.Kataoka 4A Stochastic Programming Model." Ecoometrica 31 (1963) 181-196. ...
_ _ _ Linear Mapagememt Sciemce 17 (1971)736-749. ...
Y.Seppala and T. Opana "Experimental Study on the Eficiency and ...
Programming Algoritbm." European Joural of Operations Research 16 (1984) 345-357. ...
Y. Zare Mebrjerdi :A Goal Programming Model of the Stochastic ...
Y. Zare Mebrjerdi "Plapning and Development for Water ...
Y. Zare Mebrjerdi "Analytical Approaches to Chace Constrained Programming: Theory, ...
نمایش کامل مراجع