Time Driven Activity Based Costing : Theory,Applications and Limitations

Publish Year: 1395
نوع سند: مقاله ژورنالی
زبان: English
View: 86

This Paper With 26 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_JIJMS-9-3_001

تاریخ نمایه سازی: 6 شهریور 1402

Abstract:

The aim of this study is to explore the strategic applications and limitations of Time-driven Activity-based Costing (TDABC) and to evaluate the degree of accuracy of the proponents’ arguments concerning its usefulness. In this study, published works directly related to this area from the period ۲۰۰۴-۲۰۱۵ are analyzed. This study reports TDABC's applications in strategic areas such as cost of production, unused capacity, price determination, customer profitability analysis, and modeling complex decisions in various small, medium, and large private, governmental, and nonprofit service and manufacturing organizations. However, since they are not based on any concrete empirical investigations, only future empirical studies can authentically reveal the advantages of this technique. TDABC also severely suffers from the following spheres: it lacks the ability to identify activities in the first implementation step, such as practical capacity costs rate, uniform capacity costs rate, managers’ time estimation for each activity, determination of unused capacity, as well as lack of data accuracy, and limitations of managerial decision makings. As a result of these drawbacks, proponents’ arguments regarding TDABC’s usefulness and its widespread applications -in the future and around the world- are baseless.

Keywords:

Authors

محمد نمازی

Professor of Accounting, College of Economics, Management and Social Sciences, Shiraz University, Shiraz, Iran

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • Adioti, A.A.& Valverde, R.(۲۰۱۴). “Time-driven Activity Based costing for the ...
  • Adkins, T.(۲۰۰۸).“Five Myths about Time-driven Activity-based Costing. Sascom Magazine, Second ...
  • Alinezhad SarkolaeiM;SavizM;Fathi MoradlooM; & Soleimani DahajN.(۲۰۱۳). “TimeDrivenActivity Based Costing by ...
  • Anderson, S.;Prokop,K;&Kaplan, R. S.(۲۰۰۷). “Fast-track Profit Models: More Powerful Due-Diligence ...
  • Barrett,R.(۲۰۰۵).”Time-driven Costing: The Bottom Line on the New ABC”.Business Performance ...
  • BryonK,;Everaert,P;LauwersL &Van Meensel,J.(۲۰۰۹).”Time-Driven Activity- based Costing for Supporting Sustainability Decisions ...
  • Cooper R (۱۹۸۷a.).The two stage procedure in cost accounting: Part ...
  • Cooper R. (۱۹۸۷b.).The two-stage procedure in cost accounting: Part two", ...
  • Cooper,R.(۱۹۸۹).“The Rise of Activity-based Costing: Part Three: How Many Cost ...
  • Dalci,I;Tanis,V&Kosan,L.(۲۰۱۰).”Customer Profitability Analysis with Time-driven Activity Based Costing: A Case ...
  • DemeereN,StouthuysenK,&RoodhooftF.(۲۰۰۹). “Time-driven Activity-based Costing in an Outpatient Clinic Environment: Development, ...
  • EveraertP,&Bruggeman,W.(۲۰۰۷).Time-driven Activity-based Costing: Exploring the Underlying Model”.Cost Management.۲۱(۲),۱۶-۲۰ ...
  • Everaert,P;Bruggeman,W,&Decreus,G. (۲۰۰۸).”Sanac Inc.: From ABC to Time-driven ABC (TDABC) -An ...
  • Everaert, P;Bruggeman,W;Sarens,G,;Anderson,S.R,&Levant,Y. (۲۰۰۸).Cost Modeling in Logistics Using Time-driven ABC: Experiences ...
  • Geri,N,&Ronen,B.(۲۰۰۵).” Relevance Lost: The Rise and Fall of Activity-based Costing”HumanSystems ...
  • Gervais,M; Levant,Y, &Ducrocq,C.( ۲۰۱۰).”Time Driven Activity Based Costing(TDABC): AnInitial Appraisal ...
  • Hajiha,Z,& Safari Alishah, S.(۲۰۱۱).“Implementation of Time-driven Activity Based Costing System ...
  • Homburg,C.(۲۰۰۵).”Using Relative Profits as an Alternative to Activity-based Costing”. International ...
  • Hoozee,S.(۲۰۱۳). “Designing Time Driven Activity Based Cost Systems: A Review ...
  • Hoozée S,&Bruggeman,W.(۲۰۱۰).“Identifying Operational Improvements During the Design Process of a ...
  • Ittner, C.D. (۱۹۹۹).“Activity–based Costing Concepts for Quality Improvement”.European Management Journal.۱۷(۵),۴۹۲-۵۰۰ ...
  • Kaplan, A.L.;Agarwal, N,;Setlur,N.P,;Tan, H. J.;Niedzwiecki,D.; McLaughlin,N.;Burke,M.A.;Steinberg,K,.;Chamie, K.; Saigal,C.S.(۲۰۱۵). “Measuring theCost ...
  • Kaplan,R.S.&Anderson,S.R.(۲۰۰۴). “Time-driven Activity-based Costing”.Harvard Business Review,۸۲(۱۱),۱۳۱-۱۳۸ ...
  • Kaplan,R.S.&Anderson,S.R.(۲۰۰۷a).“Time-Driven Activity-Based Costing: A Simpler and More Powerful Path to ...
  • Kaplan,R.S.&Anderson, S.R.(۲۰۰۷b).“The Speed-reading Organization, Revving up Finance with Time-driven Activity-based ...
  • Kaplan,R. S.&Anderson S.R.(۲۰۰۷c). “The Innovation of Time-driven Activity-based Costing”.Cost Management.۲۱(۲),۵-۱۵ ...
  • Kaplan,R.S.&Atkinson A.A.(۲۰۰۵).Advanced Management Accounting, Third Edition, Prentice-Hall. Englewood ...
  • Kaplan, R.S.&Porter, M.(۲۰۱۱). “The Big Idea: How to Solve the ...
  • Madhok A, Keyhani M, Bossink B .۲۰۱۵.Understanding alliance evolution and ...
  • Mandigo,M; O'Neill, K.;Mistry,B.; Mundy, B.; Millien, C.;Nazaire Y.; Damuse,R.; Pierre,C.;Mugunga,J.C.; ...
  • Monroy,C.R,;Nasiri,A,&Pelaez,M.A.(۲۰۱۲).”Activity Based Costing, Time-driven Activity Based Costing and Lean Accounting: ...
  • Namazi, M. (۲۰۰۹).”Performance- Focused ABC: A Third Generation of Activity-based ...
  • Noreen,E.&Soderstrom,N.(۱۹۹۴). “Are Overhead Costs Strictly Proportional to Their Activity: Evidence ...
  • O'Brien,T.&Rash,S.(۲۰۱۳).“Making the Most of Electronic Medical Records through Time-driven Activity- ...
  • Öker, F.& Özyapc,H. (۲۰۱۳).”A New Costing Model in Hospital Management: ...
  • Özbayrak,M.;Akgün,M.&Türker,A.K.(۲۰۰۴).“Activity-based Cost Estimation in a Push/Pull Advanced Manufacturing System”.International Journal ...
  • Oztaysi,B.; Baysan,S.& Akpinar,F.(۲۰۰۷).Effects of RFID on Tourism Sector: A Hypothetical ...
  • Pernot,E.; Roodhooft,F.& Van den Abbeese,A.(۲۰۰۷).“Time-Driven Activity-based Costing for Inter-library Services: ...
  • Ratnatunga, J.;TSe, M. &Balachandran,K.R. (۲۰۱۲).”Cost Management in Sri Lanka: A ...
  • Ratnatunga,J. & Waldmann, E.(۲۰۱۰). “Transparent Costing: Has the Emperor Got ...
  • Reddy, K.; Venter, H.& Olivier, M. (۲۰۱۱). “Using Time-driven Activity-based ...
  • Schuhmacher,K. & Burkert, M.(۲۰۱۴). “Traditional ABC and TimeDriven ABC: An ...
  • Shank,J.K. &Govindrajan, V.(۱۹۹۵).“Strategic Cost management and Value Chain”.in Reading & ...
  • Siguenza-Guzman,L.; Van den Abbeele A.; Vandewalle J.; Verhaaren H.& Cattrysse, ...
  • Siguenza-Guzman L.; Van den Abbeele A.; Vandewalle J.; Verhaaren H.;& ...
  • Smith,M.(۲۰۱۵).Research Methods in Accounting,۳nd Edition.Sage Publication Ltd., London ...
  • Stout, D.E. & Propri J.M.(۲۰۱۱).“ImplementingTime-driven Activity- based Costing at a ...
  • Somapa, S.; Cools, M.;& Dullaert, W.(۲۰۱۰). “Time Driven Activity Based ...
  • Somapa, S.; Cools, M.& Dullaert, W.(۲۰۱۱).“The Development of Time Driven ...
  • Somapa,S.;Cools,M. & Dullart,W.(۲۰۱۲).”Unlocking the Potential of Time-driven Activity Based Costing ...
  • Stout, D.& Propri,J.(۲۰۱۱). “Implementing Time-driven Activity-based Costing at aMedium-sized Electronics ...
  • Stouthuysen, K.;Swiggers, M.; Reheul, A.M.&Roodhooft, F.(۲۰۱۰). “Time-drivenActivity-basedCosting for a Library ...
  • Terungwa,A.(۲۰۱۲). “Practicability of Time-driven Activity-based Costing: A Profitability of Restaurants ...
  • TSe,M.&Gong,M.(۲۰۰۹). “Recognition of Idle Resources in Time-Driven Activity- based Costing ...
  • Wu,X.;Wang,Y.;Yue,D.& Sun,Z. (۲۰۱۱).“Modeling and Error AnalysisofTime-driven Activity-based Costing". Industrial Engineering ...
  • نمایش کامل مراجع