SCHEDULING IN A STEELMAKING-CONTINUOUS CASTING PLANT WITH OBJECTIVE OF ELECTRICAL ENERGY CONSUMPTION REDUCTION
Publish Year: 1391
Type: Conference paper
Language: English
View: 1,012
This Paper With 7 Page And PDF Format Ready To Download
- Certificate
- I'm the author of the paper
Export:
Document National Code:
ICNMO01_179
Index date: 9 March 2013
SCHEDULING IN A STEELMAKING-CONTINUOUS CASTING PLANT WITH OBJECTIVE OF ELECTRICAL ENERGY CONSUMPTION REDUCTION abstract
In this paper we describe an optimization procedure based on PSO for planning the production of steel in a steelmaking continuous casting plant. The scheduling problem is first formulated as a large scaleinteger programming and a solution approach based on particle swarm optimization is then developed.The objective of scheduling is to meet due date and minimize of waiting times. Computational experience shows the effectiveness of this approach
SCHEDULING IN A STEELMAKING-CONTINUOUS CASTING PLANT WITH OBJECTIVE OF ELECTRICAL ENERGY CONSUMPTION REDUCTION Keywords:
SCHEDULING IN A STEELMAKING-CONTINUOUS CASTING PLANT WITH OBJECTIVE OF ELECTRICAL ENERGY CONSUMPTION REDUCTION authors