Minimizing total absolute deviation completion times on Single Machine scheduling under availability constraint
Publish place: 10th International Industrial Engineering Conference
Publish Year: 1392
نوع سند: مقاله کنفرانسی
زبان: English
View: 766
This Paper With 7 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
IIEC10_360
تاریخ نمایه سازی: 10 شهریور 1393
Abstract:
this paper considers a single machine scheduling problem with the multiple availability constraints that minimizes the total absolute deviation completion times. We prove problem is NP-hard in the strong sense. Thus, because of the intensive computation, we develop discrete version of cuckoo optimization algorithm (COA) for the problem.The results of computational experiments show the good performance of the proposed algorithm.
Keywords:
Scheduling , single machine , availability constraint , cuckoo optimization algorithm (COA) , total absolute deviation completion times
Authors
Maziyar Yazdani
Department of Industrial Engineering University of Tehran Tehran, Iran
Fariborz Jolai
Department of Industrial Engineering University of Tehran Tehran, Iran
Seyyed Mohammad Khalili
Department of Industrial Engineering University of Tehran Tehran, Iran
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :