A SA algorithm for eost oriented RACP with diserete time resource tradeoff

Publish Year: 1390
نوع سند: مقاله کنفرانسی
زبان: English
View: 755

This Paper With 16 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

IPMC07_025

تاریخ نمایه سازی: 14 شهریور 1393

Abstract:

Abstract-this paper considers a project scheduling problem in which the maximum availability of resources is decision is to determine a mode and a starting time for each activity so that all constraints are obeyed and cost of resorce requirements and tardiness are minimized . all of the precedence relatinships annceling approach is proposed to solve this problem. compulational results have been renorted and the efficiency of the proposed model has been analvzed

Keywords:

Keywords-project scheduling , resource availabitlity cost problem , simulated annealing

Authors

H Atarodin

Department of industrial engineering, urmia university of technology, urmia, iran

M Sabzehpaevar

Department of industrial engineering, islmic azad university-karaj branch,karaj,iran