Case study of risk assesment for zanjan s BOO power plant project
Publish place: 7th International Project Management Conference
Publish Year: 1390
نوع سند: مقاله کنفرانسی
زبان: English
View: 782
This Paper With 8 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
IPMC07_070
تاریخ نمایه سازی: 14 شهریور 1393
Abstract:
in recent years have tried with changes in laws rearding private investrent and support the deparment imposed agreements with the private sector be used capital and advanced technologies in the industry due to the prowing population and the peoples urgent requirement to power industry and goverment budget shortage for power plant construcion projects are mostly of two types of BOO and BOT that all stages of design, construction, construction, implementation. finaccing and provision of work equipment and eventually the exploitation of the power plant and tavanir will be buyer power in this paper, the risks of the projet are studied and scrutiny and risk assessement are performed by ofrering a matrix model.
Keywords:
Authors
Nima Amani
Department of civil engineering, chaloos branch,islamic azad university, chaloos,iran