Modelling the Production Planning in the case of Production and Asset Constraint Considering the Rejected and Recycled Product keeping Centres (Case Study: Water Pump Producer)
This Paper With 17 Page And PDF Format Ready To Download
- Certificate
- I'm the author of the paper
Export:
Document National Code:
Index date: 16 February 2016
Modelling the Production Planning in the case of Production and Asset Constraint Considering the Rejected and Recycled Product keeping Centres (Case Study: Water Pump Producer) abstract
Modelling the Production Planning in the case of Production and Asset Constraint Considering the Rejected and Recycled Product keeping Centres (Case Study: Water Pump Producer) Keywords:
Modelling the Production Planning in the case of Production and Asset Constraint Considering the Rejected and Recycled Product keeping Centres (Case Study: Water Pump Producer) authors
Assistant professor, Ilam University, Faculty of Engineering, Ilam, Iran
Master Student, Industrial Engineering, Persian Golf International University, Abadan, Iran
مراجع و منابع این Paper: