سیویلیکا را در شبکه های اجتماعی دنبال نمایید.

Modelling the Production Planning in the case of Production and Asset Constraint Considering the Rejected and Recycled Product keeping Centres (Case Study: Water Pump Producer)

Publish Year: 1394
Type: Conference paper
Language: English
View: 636

This Paper With 17 Page And PDF Format Ready To Download

Export:

Link to this Paper:

Document National Code:

NRIME01_051

Index date: 16 February 2016

Modelling the Production Planning in the case of Production and Asset Constraint Considering the Rejected and Recycled Product keeping Centres (Case Study: Water Pump Producer) abstract

This study aims to provide a general modelling for production planning and the supply chain control in a large scale, in which the asset constraint and places for recycling and junking are added to the issues of production and capacity limitations of the company. Accordingly this study includes the optimization of production process besides the supply chain control proposes and the feasibility of recycle centres in order to decrease the production expense and having more profitability, which finally lead to the customer satisfaction and production system efficiency. The objective function of the model includes the optimization of the expenses on some matters such as establishment of recycling centres, production, accumulation centres, recycling and junking, warehousing, orders and transportations expenses. To estimate the model it is applied on a company which produces water pumps with different powers. The results revealed that the total expense of the system was increased in a period of 12 months related to the expense on establishment of recycle centres, while in a period of 48 month not only the money put into the recycle centres was returned, but also the production cost of each pump was totally decreased for 11 unites. This decline in the total expenses was due to the balance made by using the recycled materials instead of the new raw materials. To sum up, the more factories in which recycled materials are used, the less expenditure is predicted for system in all.

Modelling the Production Planning in the case of Production and Asset Constraint Considering the Rejected and Recycled Product keeping Centres (Case Study: Water Pump Producer) Keywords:

Modelling the Production Planning in the case of Production and Asset Constraint Considering the Rejected and Recycled Product keeping Centres (Case Study: Water Pump Producer) authors

Masud Seidi

Assistant professor, Ilam University, Faculty of Engineering, Ilam, Iran

Mehdi Jamshidnia

Master Student, Industrial Engineering, Persian Golf International University, Abadan, Iran

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
Wang, R-C and Fang H-H. (2000). "Aggregate production planning with ...
Lai, Y.J and Hwang, C.L. (2011). "Lecture notes in economics ...
Singhal, J. and Singhal, K. (2006). "Holt, Modigliani, Moth, and ...
Te chawiboonwong. A . and Yenradee, P. (2013). "Aggregate production ...
Feizabadi, Javad. _ Introductory to Supply Chain Management", Tadbir Journal; ...
Stedler and Kliger. Supply Chain Management and Advanced Planning. Translators: ...
Mark, CH, (2013), "Product liability under the Consumer Protection Act, ...
Jones, A., (2012), "Analysis of Algorithms: An Active Learning Approach, ...
Masud, A.S.M. and Hwang, C.L. (2011). "Aggregate production planning model ...
نمایش کامل مراجع