Development a Framework for Prioritizing and Selection of Civil Projects Contractors at Tehran Municipality
Publish place: کنفرانس بین المللی پژوهش در علوم و مهندسی
Publish Year: 1395
نوع سند: مقاله کنفرانسی
زبان: English
View: 558
This Paper With 8 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
این Paper در بخشهای موضوعی زیر دسته بندی شده است:
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
ICRSIE01_100
تاریخ نمایه سازی: 25 آذر 1395
Abstract:
Prioritizing and selection of contractors are significant in many civil projects. Contractors are the fundamental part of civil projects and they have significant role in turning existing resources into products and services. Therefore, implementation of projects requires an appropriate contractor. Usually contractors are selecting based on the lowest recommended cost. But there are other qualitative and quantitative criteria with different degree of significance that should be considered for selection of contractors. In this paper, in addition to identifying effective criteria for selecting contractors, the significance and priority of criteria is determined by applying a group AHP model for one of the big civil projects of Tehran Municipality
Keywords:
Civil projects , prioritizing criteria for contractors , AHP analysis , Multi-criteria decision making
Authors
Hamid Reza Ahadi
Assistant Professor at School of Railway Engineering, Iran University of Science and Technology
Shafagh Alaei
Rail Transport Eng. Graduate Student, Iran University of Science and Technology,
Sasan Amini
Industrial Engineering Graduate Student, Sharif University of Technology,
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :