Incentives and Disincentives in Maintenance Scheduling of Generating Units in Power Market
Publish place: 14th Iranian Conference on Electric Engineering
Publish Year: 1385
نوع سند: مقاله کنفرانسی
زبان: English
View: 1,558
This Paper With 8 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
این Paper در بخشهای موضوعی زیر دسته بندی شده است:
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
ICEE14_413
تاریخ نمایه سازی: 25 تیر 1387
Abstract:
In this paper, a new approach for maintenance scheduling of generating units of GENCOs in competitive environment is presented. In this
environment, management of GENCOs and grid is separated, each maximizing its own benefit. The objective function for the GENCO is to sell electricity as much as possible, according to the market clearing price forecast. Various technical constraints such as generation capacity, duration of maintenances and maintenance continuity are being taken in to account. The objective function of ISO is to maximize the reliability throughout the weeks of year; subject to the energy purchase cost doesn’t increase from a predetermined amount when the units of GENCOs are out for maintenance. Therefore there are two objective functions for finding an optimum maintenance schedule in restructured power systems. In this paper we apply Genetic Algorithm methodology for finding the optimum preventive maintenance schedule of generating units.
Authors
R. Eshraghnia
Master of Engineering, Department of Electrical Engineering Ferdowsi University of Mashhad Iran
M.H. Modir Shanechi
Associate Professor
H. Rajabi Mashhadi
Assistant Professor
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :