Review of BIM Innovation in Construction Management
Publish place: International Congress on Engineering Innovation
Publish Year: 1395
Type: Conference paper
Language: English
View: 626
This Paper With 14 Page And PDF Format Ready To Download
- Certificate
- I'm the author of the paper
Export:
Document National Code:
ICEICONF01_068
Index date: 26 April 2017
Review of BIM Innovation in Construction Management abstract
Controlling construction site operations is one of the crucial overriding concerns for the clients and contractors, as the majority of the construction delays tend to occur in the construction phase. It is not surprising to see interest in deploying advanced technologiessuch as Building Information Modelling (BIM) to help in addressing such concerns. BIM is a process by which a digital representation of the physical and functional characteristics of a facility are built, analyzed, documented and assessed virtually, then revised iteratively until the optimal model is documented. The virtual BIM model is not only graphical design but also a virtual database which includes the management data. So the construction manager (CM) can use BIM as a real simulation of the actual project. As explained above, it can be firmly stated that BIM makes the project with the least interference and risk in construction phase and achieve to predefined objectives such as time, cost and quality. The purpose of this paper is to investigate how to integrate BIM with the daily construction activities to increase the effectiveness of construction operational activities.
Review of BIM Innovation in Construction Management Keywords:
Review of BIM Innovation in Construction Management authors
Reza Mahmudi Hasankhanlo
MSC. Student Project Management and Construction program, Architectural Department, University Of Tehran, Iran
Akbar Marefat
MSC. Student Project Management and Construction program, Architectural Department, University Of Tehran, Iran
Hossein Naghash toosi
Assistant Professor, Architectural Department, University Of Tehran, Iran
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :