سیویلیکا را در شبکه های اجتماعی دنبال نمایید.

Role of Reliability analysis to indicate the time of Preventive Maintenance: A case study in RAJA Passenger Train Co.

Publish Year: 1387
Type: Conference paper
Language: English
View: 2,855

This Paper With 11 Page And PDF Format Ready To Download

Export:

Link to this Paper:

Document National Code:

RTC10_042

Index date: 20 October 2008

Role of Reliability analysis to indicate the time of Preventive Maintenance: A case study in RAJA Passenger Train Co. abstract

Nowadays, several studies have been carried out addressing transport network reliability acknowledging it as a priority for future research. This research concentrates the role of reliability on railway as a type of transportation system. And also describes the impact of reliability to preventive maintenance plans and schedules. So the present paper at first introduces the rolling stock maintenance strategies and the concept of reliability, subsequently it demonstrates the reliability usage in a case study in Raja passenger corporation in Iran concerning the wheelset of coaches. The paper elaborates that wheelsets are the bottleneck of Raja Corporation in service, then it utilizes the historical data of various types of wheelsets and analysis them to acquire the reliability function via STATISTICA 6.0 Software. Therefore, the reliability of each type of whhelsets will be identified in different time intervals and it can be used to determine the appropriate time of preventive maintenance tasks.

Role of Reliability analysis to indicate the time of Preventive Maintenance: A case study in RAJA Passenger Train Co. Keywords:

Role of Reliability analysis to indicate the time of Preventive Maintenance: A case study in RAJA Passenger Train Co. authors

Seyed Mohammad Rezvani Zaniani

Joint master students of maintenance engineering in Luleå University, Luleå, Sweden and Sharif University, Tehran, Iran

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
Smith, Anthony. M, Hinchcliffe, Glenn R, ،RCM- Gateway to world ...
and control of maintenance systems: Planning؛ [2] Duffuaa, Salih. Raouf, ...
British Standard, BS3811:1984 ...
Kumar, U., Kelefsjo, B.., «Reliability analysis of hydraulic system of ...
and maintainab ility analysis of crushing plants in Jajarm Reliability؛ ...
Kumar, U., Kelfsjo, B., Granholm, S., «Reliability investigations for a ...
Garc1' a Ma rquez F. P., Pedregal Tercero D. J., ...
Blischke, Wallace, R., Prabhakar Murthy D. N., 44Case studies in ...
Kalinowski B., Anders G., ،A new look at component maintenance ...
Railway magazine of the Islamic republic of Iran ...
Kumar A, Pathak RM, Gupta YP.، _ Gemetic _ algorithm-b ...
Taguchi T, Yokota T, Gen M. Reliability optimal design problem ...
Levitin G, Lisnianski A, Ben-Hain H, Elmakis D. «Redundancy optimization ...
optimization of multistate system with Structure؛، [15] Lisnianski A, Levitin ...
Blischke, Wallace, R., Prabhakar Murthy D. N., 44Case studies in ...
Graham H, *Life Cycle Cost Issues in Rolling Stock Asset ...
نمایش کامل مراجع