Evaluate the income and costs expected lines and watering grid downstream of the barrier Chamshir Gachsaran

Publish Year: 1395
نوع سند: مقاله ژورنالی
زبان: English
View: 267

This Paper With 10 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_AJISR-2-4_013

تاریخ نمایه سازی: 21 فروردین 1397

Abstract:

Thtnvan study Evaluate the income and costs expected lines and watering grid downstream of the barrier is studied traditional Chamshir.Given researches descriptive and analytical information using multiple criteria decision making and design through field studies and questionnaires with population includes managers, project experts collected, classified and were analyzed Results of this study show that as of project development begins, the project will generate income, but because not completed on time. Production capacity will be available late. As a result, the effects are found and swelling capacity and the effects of income and because projects take too reasonable,... The management criteria, environmental and technical respectively have the lowest impact on latency.Since the technical criteria have the least effect on delaying projects and national development technically it has reached the stage of prosperity

Authors

Iraj Golestani

Department of Management, Yasouj Branch, Islamic Azad University, Yasouj, Iran

Yaghoob Zeraatkish

Department of agricultural economics, Tehran science and Research Branch, Islamic Azad University, Tehran, Iran