Angular Fuzzy Fault Tree Analysis for Construction Projects Delay

Publish Year: 1388
نوع سند: مقاله کنفرانسی
زبان: English
View: 2,234

This Paper With 12 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

IPMC05_146

تاریخ نمایه سازی: 25 تیر 1388

Abstract:

Delays in construction projects are inevitable; as a result claims and disputes arise among different construction parties. Different causes of delay can come into play. therefore, there is a need to identifY and classify different causes of project delay. Estimation of the likelihood of delay resulting from different factors that contribute to project delay is essential to project success. Tbere is a pressing need to estimate tbe likelibood of delay by implementing analysis methods and examining these metbods. Fuzzy fault tree analysis is suggested by this research to estimate tbe likelihood of delay. The result of the fuzzy fault tree analysis is a likelihood of delay membership function that is compared to the predefined fuzzy logic model to assess the degree of severity of the likelihood of delay. Likelihood of delay membership function is further quantified using the weighted average defuzzification method. Angular fuzzy logic models are implemented into the fuzzy fa.ult tree analysis, using Visual Basic software. Validation of the fuzzy fault tree analysis computer model is perfonned. The computer software suggested by this study is an attempt to help reduce delays in construction projects that can cause time loss.

Authors

A.R Afsbari

Islamic Azad University, Sbirvan branch

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • Arditi D, Akan GT, Gurdamar S. Reasons for delays in ...
  • Aibinu A, Odeyinka H. Construction delays and their causative factors ...
  • AJ-Gbafly MA. Delays in tbe construction of public utility projets ...
  • AJ-Humaidj 2002 After the Fact Delay Analysis Techniques, Master's Thesis, ...
  • Alkass _ Mazerolle M, Harris F. Constructioo delay aalysis techriques. ...
  • Assaf SA, Al-Hejji _ Causes of delay in large construction ...
  • AssafSA, A-Khali] M, Al-Hazmi M. Causes of delays in large ...
  • Ayyub, B. M., Risk Analysis _ Engineering and Economics Class ...
  • Baldwin JR. Mathei JM, Rothbart H, Harris B. Causes of ...
  • Chaq DW, Kumaraswamy MM. A comparative study of causes of ...
  • Dlakwa MM, Cupin MF. ReAsons for overmun in public sector ...
  • Fujino, T. and Hadipriono, F.C., 'Fuzzy Fault Tree Analysis for ...
  • Hadipriono, F. 1995. "Fuzzy Sets ir Probabiliste Structural Mechapics, " ...
  • Hadipriono, F. C. (1985). Assessment of false work performance using ...
  • Hadipriono, F. C., and K. M. Sun (1990). Angular fuzzy ...
  • Hadipriono, F. C., and K. M. Sun (1995). Rating Space ...
  • Hadipriono, F.C and Th, H.S. (1989). "Modifed Fault Tre Anayss ...
  • Hadipriono, F.C. (1987). Fault Tree Nework Analysis for Construction. Joumal ...
  • Kaming P, Olomolaiye P, Holt G, Haris F. Factrs infucncing ...
  • Kumaraswamy M, Chan D. Contributors o construction delay. Construct Manage ...
  • Lo TY, Fuug IWH, Tung KCF. Coastruction delays in Hong ...
  • Mans6eld NR, Ugwu OO, Doran T. Causes of delay and ...
  • Noulmahee A, Wachira thamroj _ J, Tantichattanot P, Sittivjan P. ...
  • Oguplana SO, Promkuntoog K, Jearkjipm V. Costruction delays i a ...
  • Okpala DC, Aniekwu AN Causes of high costs of construction ...
  • Riad, N., Arditi, D., and Mohammadi, J. (1989). _ conceptual ...
  • Ross T.J., "Fuzzy Logic With Engineering Applicarion", _ Jobn Wiley ...
  • Sade, L. A. (1965). 'Fuzzy sets." Information Control, 8, 33835 ...
  • Schumacher, L. (1996). _ integrated ad proactive approach for avoiding ...
  • Semple C, Harman FT, Jergeas G. construction claims and disputes: ...
  • Shi J, Cheung S, Arditi D. Cotstruction delay computation method. ...
  • Stumpf G. Schedule delay analysis. Cost Eng J 2000; 42(7):3243. ...
  • نمایش کامل مراجع