The integrated order acceptance, production planning and scheduling problem in a flexible job shop environment

Publish Year: 1398
نوع سند: مقاله کنفرانسی
زبان: English
View: 408

This Paper With 6 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

ICIORS12_231

تاریخ نمایه سازی: 24 شهریور 1398

Abstract:

Researchers have considered the integration of short term and mid-term decision-making problems, due to the need for real-worldproduction planning. Nowadays, by increasing in customer-oriented systems and according to production capacities and coordination between manufacturing sector, order acceptance is an important issue. In the past, these problems were considered separately, which led to inconsistencies in production systems and order s delivery. In this paper, the integrated problem of order acceptance, production planning and scheduling in a flexible job shop environment, for the first time, is considered. A novel mixed integer bi-objective mathematical model is proposed for minimizing makespan and maximizing profit. The classic LP-metric and Goal Programming techniques are used to solve the model and make Pareto solutions. A metric indicator of coverage and distance have shown that the L-P metric is a bett er approach for a descriptive example.

Authors

Faezeh Falahati

Department of Industrial Engineering, Babol Noshiravani University of Technology, Babol IRAN,

Saeed Emami

Department of Industrial Engineering, Babol Noshiravani University of Technology, Babol IRAN,

Ebrahim Asadi Gangraj

Department of Industrial Engineering, Babol Noshiravani University of Technology, Babol IRAN,