JUST-IN-TIME SCHEDULING WITH TOOL REPLACEMENT CONSIDERATIONS
Publish Year: 1382
نوع سند: مقاله کنفرانسی
زبان: English
View: 39
This Paper With 8 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
ISME11_069
تاریخ نمایه سازی: 29 بهمن 1402
Abstract:
This paper addresses the combined JIT scheduling and tool replacement problem on a machining centre. The objective is to determine job sequence, tool spare requirement and corresponding replacement intervals so that the total expected processing cost is minimized. Due to the combinatorial nature of the problem, a tabu search approach is proposed to find good and quick solutions. An example problem is solved to illustrate the proposed procedure
Keywords: