Poroject work package clasifying by a hauristic method to reach mimimum cost delay time

Publish Year: 1390
نوع سند: مقاله کنفرانسی
زبان: English
View: 756

This Paper With 9 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

این Paper در بخشهای موضوعی زیر دسته بندی شده است:

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

IPMC07_029

تاریخ نمایه سازی: 14 شهریور 1393

Abstract:

This paper prents an application of genttic algorithms in project planning and project scheduling problem. There are strict requirements of time bounded and budget cost for projects. Project management causes the problem of efficent resource assignment . acivity, tme constraints and relationships between activites . genetic algorthm uses random presentation of chromosome and two types of crossover uniform and arithmetic. the proposed solution is employed on a problem for verification.

Authors

Rasoul jamshidi

Department of industrial Engineering, Amirkabir university of technology

Ali asghar pirali

Department ofmanagment, university of techran

Sayyed mohammad tarhi fatemi

Department of industrial engineeering amirkabir university of technology