Poroject work package clasifying by a hauristic method to reach mimimum cost delay time
Publish place: 7th International Project Management Conference
Publish Year: 1390
نوع سند: مقاله کنفرانسی
زبان: English
View: 756
This Paper With 9 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
این Paper در بخشهای موضوعی زیر دسته بندی شده است:
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
IPMC07_029
تاریخ نمایه سازی: 14 شهریور 1393
Abstract:
This paper prents an application of genttic algorithms in project planning and project scheduling problem. There are strict requirements of time bounded and budget cost for projects. Project management causes the problem of efficent resource assignment . acivity, tme constraints and relationships between activites . genetic algorthm uses random presentation of chromosome and two types of crossover uniform and arithmetic. the proposed solution is employed on a problem for verification.
Keywords:
Authors
Rasoul jamshidi
Department of industrial Engineering, Amirkabir university of technology
Ali asghar pirali
Department ofmanagment, university of techran
Sayyed mohammad tarhi fatemi
Department of industrial engineeering amirkabir university of technology