CAPITAL BUDGETING AT UNRELIABLE CONDITIONS Financial Management

Publish Year: 1393
نوع سند: مقاله کنفرانسی
زبان: English
View: 977

This Paper With 5 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

ICMNG01_045

تاریخ نمایه سازی: 27 آبان 1393

Abstract:

This document is about One Company that have special Situation and is faced with Capital budget constraints and is inevitable to make decision about Giving ;to continue or stop incomplete projects and if it can not Financing for its projects will not do payment at the time then Contractors will be encounter problems and will not be bound to regard the owners Strategy. THE goal of this article is: Be designed the suitable discipline for financial management and when Forecasts can be changed by many reasons; produce the program to allocate the financial Resources .The results are on the base of Studies and work experience in control project unit .In existing methods; to evaluate the projects all the risks be considered by factors such as interest rate and return rate .we can give new expected case of return rate on the base of existing probabilities of future inflation situation and do accounts exact present value for the expenses with a view to probabilities for integrity of previous accounts and project progress percent and Finally we can estimate existing risks exactly.

Keywords:

Capital badgeting , project: risk: return rate

Authors

EFFAT SAMIE GHAHFAROKHE

Student of Construct management and Engineering of civil Engineering Amirkabir university of Technology Tehran, Iran

A EGHBAL SHAKERI

Member of the Board of Editors of Civil Engineering Amirkabir university of Technology Tehran, Iran