EFFECTS OF GAS INJECTION TIME ON RESERVOIR RECOVERY FACTOR
Publish Year: 1394
نوع سند: مقاله کنفرانسی
زبان: English
View: 801
This Paper With 16 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
ICOGPP03_056
تاریخ نمایه سازی: 25 بهمن 1394
Abstract:
Nowadays oil and gas are the main source of fuel. Limitations in exploration and exploitation of these resources is a significant need for the development of productivity. The injection of gas into oil reservoirs has the capacity to create significant changes in the oil and gas basin. And it seems that gas injection to improve operating scale production parameters helps. Gas injection to increase oil recovery. But in the meantime little research on the optimal timing of gas injection into the reservoirs performance and check software is Eclipse E300. Therefore, in this research using E300 software optimization scenario time and over the life of the desired oil reservoir has been investigated. Order to achieve the target by using a software Experiment design to optimize the test of time injection reservoir with the optimum operating conditions are determined And then with another design the most optimal injection scenario obtains.
Keywords:
Gas injection , increase oil recovery , optimal timing of injection , experimental design , oil reservoirs
Authors
a samani nezhad
Department of Petroleum Engineering, Islamic Azad University of Omidiyeh;
r roghanian
Head Reservoirs Evaluation, National Company South Oil (NISOC);
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :