The use of meta-heuristic methods to solve resource-constrained project scheduling and different administrative situations and allowance to cut activities with cut costs
Publish Year: 1394
نوع سند: مقاله کنفرانسی
زبان: English
View: 483
This Paper With 10 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
AMSCONF03_440
تاریخ نمایه سازی: 12 تیر 1395
Abstract:
In this research, a modeling for problem of project scheduling is presented with cut allowance and multiple administrative methods for each activity considering costs of earliness and tardiness. Genetic algorithm was used to solve this problem, and finally in order to prove algorithm’s capability solving mentioned problem, the results were compared with absolute and exact results by LINGO software for small problems and evaluation indicators of algorithm for big ones, respectively. In the end, a proper algorithm with desired efficiency is presented to solve the above problem.
Keywords:
Authors
Abteen Asgari
Faculty of Industrial and Mechanical Engineering, Qazvin Branch, Islamic Azad UniversityQazvin, Iran
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :