Integrated preventive maintenance planning and production scheduling for single machine by Genetic Algorithm

Publish Year: 1396
نوع سند: مقاله کنفرانسی
زبان: English
View: 530

This Paper With 6 Page And PDF and WORD Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

این Paper در بخشهای موضوعی زیر دسته بندی شده است:

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

INDUSTRIAL03_0684

تاریخ نمایه سازی: 26 مرداد 1397

Abstract:

However, there is an interrelationship between preventive maintenance and production scheduling but almost in all industrial units they are planned separately; in other words, preventive maintenance is planned in the aim of maximizing the machines availability but the main aim is maximizing customer satisfaction by minimizing total weighted expected completion time. In this paper we suggest practical methods for integrating production scheduling and maintenance planning model. We choose Rafsanjan Arvand Wheel Co. for assaying this model. The results of implementing of model in industrial scale is represented in detail. Aside of coordinating production and maintenance operations, Concluded results shows that this model can be very effective. Calculations shows 42% improvement in total weighted completion time of clients’ orders that has a great impact on customer satisfaction.

Authors

Hamed Vares

Department of MBA, Faculty of Management, University of Tehran, Tehran, Iran

Majid Sabzehparvar

Department of Industrial Engineering, Islamic Azad University, Karaj Branch, Karaj, Iran

Mohammad Javad Bannazadeh

Department of MBA, Faculty of Management, University of Tehran, Tehran, Iran